Project data

System capacity
1.999 kWp
Type
Rooftop system
Location
Siegenburg, Bayern
Year
2026

Project description

The system at the Siegenburg logistics center, at 1,999 kWp, is one of the largest rooftop PV projects Greenion has delivered to date. At its core is a 4 MWh battery storage system that buffers generated solar power and significantly increases the self-consumption rate of the energy-intensive operation. The energy system is complemented by fast EV charging stations on site.

Greenion managed the complete EPC process: works and assembly planning, design and construction of two new LV switchboards (NSHV-PV), implementation of the full communication concept and control systems, certification, grid application and permitting through to turnkey commissioning. The battery integration allows the facility to shave peak loads — for both production and charging infrastructure — and maintain self-consumption into the evening and overnight hours.

Request a similar project

Your project with us?

Your project with us?

Get in touch