Food Manufacturer Bergheim
600,3 kWpRooftop system · Bergheim, NRW · 2024


1 / 3
Project data
- System capacity
- 600,3 kWp
- Type
- Rooftop system
- Location
- Bergheim, NRW
- Year
- 2024
Project description
In Bergheim, Greenion was called in under exceptional circumstances: the original contractor had delivered the DC installation of the 600 kWp rooftop system at a food manufacturer's facility incomplete and with multiple errors — and had entered insolvency during the project.
Greenion carried out a systematic fault analysis of the entire DC side, coordinated the remediation of defective installation areas, and ultimately completed the full commissioning including grid operator acceptance. The project demonstrates Greenion's competence not only in new construction but also in demanding troubleshooting and remediation scenarios — a testament to the reliability our clients can count on even in difficult project situations.